Construction progress as of 21 January 2025

21.01.2025

Impressive on the outside and refined on the inside. Our complex is filling up and acquiring new features: graceful lines, elegant compositions, exquisite highlights in the materials that will surround you every day.

◽️ General

The installation of entrance doors, glazing of commercial premises and entrance groups of all sections of the complex has been completed. The installation of hinged facade elements from sections 1 to 5, as well as stormwater systems of the sections, has been completed.

◽️ Section I

Window frames have been installed and work on glazing residential premises is being completed. The facade on Shchekavytska Street has been insulated.

◽️ Section II

The glazing of the apartments in the section is 95% complete.

◽️ Section VI

The doors to each apartment and passage are installed, and the readiness is 100%.

◽️ Section VII

The showroom format of the 2nd floor of the 7th section has been completed.

100% of the interior doors in the section have been installed.

At least a piece of the beauty of La Manche is already in the photo report!