◽️Section V
Installation of 2 elevators of the section
Finishing of 2 elevator shafts has been completed
◽️Section IV
Installation of elevator equipment has been completed
Finalization of decoration of 2 elevator shafts
Window structures (stained glass windows) have been installed in the elevator shafts
Installation of double-glazed windows is 100% complete
◽️Section III
Materials have been delivered and work on glazing the section is being finalized
Installation of 95% of the total volume of the section windows